|
Approval Process & Procedure
Members are required to submit two (2) copies of blueprints or elevations drawings to the Architectural Control Committee (ACC) prior to construction. Additionally, the ACC will need to have a comprehensive and complete plat plan showing ALL HUMAN MADE ITEMS. This includes such things as swimming pools, driveways, and air conditioner compressors. For the complete list, see the Architectural Requirements & Guidelines.
Failure to comply with the above requirements will delay the approval process!
|